| MOQ: | 500m2 |
| Price: | US $ 25-65/m2 |
| Standard Packaging: | Packing in Containers or Bulk |
| Delivery Period: | 25-30 days |
| Payment Method: | L/C,T/T |
| Supply Capacity: | 3000tons/month |
Steel Structure Building metal warehouse designed for industrial storage featuring durable construction and customizable design options
Wall panels are available in multiple materials including EPS, Rock Wool, Glass Wool, and PU, offering excellent insulation and protection against environmental elements. The H Section frame construction provides superior strength and stability, capable of withstanding heavy loads and harsh weather conditions.
| Component | Specification |
|---|---|
| Main Steel Frame (Column) | Q235B, Q355B Welded or Hot-rolled H Steel |
| Main Steel Frame (Beam) | Q235B, Q355B Welded or Hot-rolled H Steel |
| Purlin | Q235/Q355B C and Z purlin |
| Knee Brace | Q235 Angle Steel |
| Wall/Roof Panels | EPS / Glass Fiber / Rock Wool / PU Sandwich Panel / Steel Sheet |
| Door | Rolling Up/Shutter Door, Sandwich Panel Door, Stainless Steel Door, Fireproof Door; |
| Window | PVC window, Aluminium Window; |
| Wind Resistance Grade | according to local climate |
| Earthquake-resistance | 8 Grades |
| Structure Lifespan | Up to 50 years |
Flat packed into 40'HQ or separate into 40'OT.
A: We are a manufacturer with over 15 years experience in metal products. We welcome factory visits to demonstrate our quality control processes and offer competitive pricing.
A: Freight costs depend on shipping method (sea/air) and destination port/airport. Please provide specific details for an accurate quote.
A: We offer the best value - either superior quality at comparable prices or competitive pricing with equivalent quality standards.
A: We supply detailed installation drawings and videos. Engineers or full installation teams can be dispatched upon request.
A: Yes, we provide complete design solutions using AutoCAD, PKPM, Tekla Structures and other professional software for various building types.
A: Standard delivery to nearest Chinese seaport is approximately 30 days after deposit receipt, depending on order quantity.