Angola 4S store

Other Videos
December 18, 2025
Category Connection: Commercial Steel Building
Brief: Wondering how modern high-rise prefabricated steel structures compare to traditional construction? This video showcases the Angola 4S store, demonstrating how these innovative buildings offer accelerated construction, design flexibility, and diverse applications for hotels, schools, and hospitals. See the assembly process, technical specifications, and real-world benefits for commercial, residential, and industrial projects.
Related Product Features:
  • Accelerates construction by 30-50% through factory-prefabricated steel components with precise numerical control technology.
  • Increases usable floor area by 10-15% compared to concrete buildings with compact steel columns and beams.
  • Offers design flexibility for easy customization of floor plans, renovations, and future expansions.
  • Suitable for diverse applications including commercial complexes, residential apartments, and industrial workshops.
  • Features high load-bearing capacity with H section steel Q355B columns and beams for structural integrity.
  • Provides customizable cladding options with PPGI steel sheets or insulated sandwich panels for roofs and walls.
  • Includes optional overhead cranes with 5 to 20-ton capacity for industrial and logistics facilities.
  • Supports custom design solutions based on architectural drawings or client requirements with professional technical support.
FAQs:
  • Do you provide installation support for the steel structure buildings?
    We supply detailed installation drawings and videos. Engineers or full installation teams can be dispatched upon request to ensure proper assembly and construction.
  • What design services do you offer for custom building projects?
    We provide complete design solutions using AutoCAD, PKPM, Tekla Structures and other professional software. Our team creates custom plans based on your drawings, ideas, or specific requirements including local wind speed, snow load, and building dimensions.
  • What is the typical delivery time for a prefabricated steel structure building?
    Standard delivery to the nearest Chinese seaport is approximately 30 days after deposit receipt, though this may vary depending on order quantity and customization requirements.
  • How does the construction speed compare to traditional concrete buildings?
    Prefabricated steel structures reduce on-site construction time by 30% to 50% through factory-made components that require only bolt connections and simple welding during assembly.
Related Videos

Steel Structure Steel Material for Storage Water Tank Tower

Steel Structure Water Tank Tower
November 25, 2025