Type: | Prefab Modular House | Main Material: | Galvanized Steel Frame |
---|---|---|---|
Main Frame: | G550 Galvanized | Application: | Villa/living Room |
Insulation: | 50mm Glass Wool | Life Span: | 90 Years |
High Light: | ready made prefab house,custom built prefab homes |
Beautiful Prefabricated Small Structure Prefab House/Modern Cheap Prefab House
It is popular day by day , as the excellent performance , Green , fast to build , water / heat / fire insulation , good anti-resismic and wind-proof .
Light Steel villa's floor is composed of light gauge cold-formed steel shape or composite beam, OSB structure board, support and connected components etc. The material is oriented strand board(OSB), cement-fibre board, and plywood. On such lightweight floor, it can bear about 316~365 KG load per square meters.
TECHNICAL PARAMATERS | |
Steel Column | G550 AZ150 Galvanized Steel (Hot-formed Aluminum coating steel) |
Roof Frame | G550 AZ150 Galvanized Light Steel keel |
Structural slab | Oriented Stand Board(OSB board) |
Insulation | Glass wool |
Wall | Exterior wall cladding/Interior wall bamboo fiber board |
Floor | Ceramic tile/wooden ground floor |
Ceiling | 12mm Gypsum board/10mm Banboo fiber board |
Electric | Ceiling lights, electric wire, socket |
Window | Aluminum window/hollow glass window |
Doors | Entrance door: steel security door, Inner door: wooden molded door |
Toilet | Sprinkler, hand basin ,water closet |
Drainage system | Provide plan, design and materials |
Life span | 70 Years |
Container loading | According to the order and custumer's requirements |
Delivery time | 20-30 working days after recepting the deposit |
Application | Hotel,House,Office,Shop,Villa |
1. Excellent seismic performance. The overall structure is firm, light weight and uniform load distribution.
2, good insulation performance. The multi-layer board is filled with insulation material, and the insulation performance is improved by 65% compared with the brick-concrete construction method.
3. The construction period is short. The prefabrication of the materials is done at the factory and the installation takes only 30 days and can be carried out all year round.
4. The overall cost is low.